Residential self-consumption project made up of 16 330W panels that generate 8,500 kWh per year.
Home //
Residential self-consumption project made up of 16 330W panels that generate 8,500 kWh per year.
Construction of the Transmission Line for VENTUS Wind Power Plant, in Metapán, Santa Ana.
The 69kv line, built with 27-meter-high poles and resistances up to 15,500 lbf of tension at the peak of the workload, was built in order to transfer the energy generated by 270,000 solar panels to the substation.
Voltage:
69,000 MW
Project execution with installation of the following poles: Two 30 m C-15K poles, Two 30 m C-19K poles, Two 33 m C-19K poles.
Voltage
115 kV
Construction and supply of fittings and conductors for a 115 kV High Voltage Electric Line for the 7.8 km Albireo Photovoltaic Plant located between Ozatlán and Jiquilisco, Usulután. Conductors for the 477 flicker phase and 24-wire OPGW Fiber Optic Guard Cable.
2 posts of 30m C-15K, 4 posts of 33m C-18K, 2 posts of 36m C-17K.
Construction of the Transmission Line for VENTUS Wind Power Plant, in Metapán, Santa Ana.
Design and construction of a 23 kV primary distribution line and supply of construction materials for the El Trebol - La Joya Line.
Project that served as a platform to electrify a large amount of Petenero territory in the north of the country, from the municipality of La Libertad to the Aldea El Naranjo, 70 km of A. T. lines, contributing to the development of the largest department of Guatemala.
Voltage:
69,000 KVA